Overall Objective 
To contribute to the reconciliation and coexistence of the multicommunal landscape of Cyprus.
Output
Constructed premises for the Kormakitis Centre for Cooperation 
Location
Kormakitis village 
Type of investment
Construction of a community centre building 
Description of investment

Construction of the Centre which will host three types of activities:

  • Camping

The centre is fully equipped in order toto host approximately 70 visitors offering basic accommodation facilities and catering. Focus and attention will be mainly devoted to the young generations looking to meet, engage, share and experience.

  • Cultural activities

KCC is organising or hosting cultural events from all over Cyprus and beyond, promoting the multiculturalism of the island and providing the opportunity for young artists and talented people to present their skills and passion towards culture and art. At least 6 events will be organised annually.

  • Education

The KCC aims to develop into a diversified education centre offering a wide variety of educational programs targeting to serve the general educational needs around the acquiring of general knowledge, including but not limited to, basic elementary education, programs on the history and culture of Cyprus, languages and tradition, nature preservation and recycling, agricultural development of organic products etc. 

Intended beneficiary

Direct beneficiary: Kormakitis Centre for Cooperation (KCC)

Indirect beneficiaries: young people from all communities of Cyprus; with annually around 120 young people benefiting from camping activities, 600 visitors for cultural activities and 75 children from educational activities.  

Scope of works

The building constructed is a two-storey reinforced concrete building. The surface area per floor is:

  • Covered ground floor – 779.7 m2
  • Semi covered ground floor – 252 m2
  • Uncovered ground floor – 124 m2
  • Covered first floor – 424.3 m2
  • Semi-covered first floor – 252.5 m2
  • Uncovered first floor – 130.6 m2

The ground floor includes 3 classrooms with toilets, corridors, a reception area, service rooms, toilets, a restaurant/conference hall, a fully equipment kitchen and storage room.  

The first floor contains 4 dormitories with bathrooms, a room for the educators, toilets, service rooms and corridor.

On the roof, a 15kWp PV system had been installed. 

Actions taken by UNDP
  1. Preparation of main design
    The main design was completed in January 2021 following various modification of the original designs in order to fit within the approved budget.

  2. Property check
    Completed
  3. Procurement
    Completed
  4. Implementation of work contract
    Contract signed: July 2021
    Commencement of works: September 2021
    Works completed: January 2023
  5. Installation of the kitchen equipment and PV system
    Contract signed: October 2024
    Installation of PV completed: December 2024
    Installation of the kitchen equipment: February 2025