Friendly Energy Systems in Lefka/Lefke local community

Project Title 
Friendly energy systems in Lefka/Lefke local community 
Overall Objective 
To reduce the energy costs for the local community of Lefka/Lefke 
Output
Energy and Energy Efficiency Measures Implemented in Lefka/Lefke 
Location
Lefka/Lefke, Cyprus 
Type of investment
Construction and Installation Works
Description of investment

Three investments are planned under this project:

  • Installation of a 300 kWp solar photovoltaic system

  • Introduction of a water pumping automation system
  • Replacement of water leaking reservoirs with new 150 m3 water tanks 
Intended beneficiary

Direct beneficiaries: Lefka/Lefke local community

Indirect beneficiaries: Lefka/Lefke community members

Scope of works

Energy use by the local community (LC) of Lefka/Lefke is inefficient and results in higher energy cost for the LC. Given the limited financial resources of the LC, this creates a burden that limits the ability of the LC in the provision of better services to its population.

Through the installation of a 300 kWp solar photovoltaic system, close to 500,000 kWh will be produced per year which will represent savings in the range of EUR 80,838 per year for the LC.

With the introduction of an automated pumping system for the water supply system of Lefka/Lefke, it is estimated that the LC will be reducing its electricity consumption by 579,417 kWh per year or more than EUR 81,000 per year of savings for the LC.

Some of the water reservoirs are leaking. It is estimated that the water leakages reach more than 75 m3 per day or 27,375 m3 per year. This represents EUR 16,425 of potential savings per year.

Through the three proposed investments, the LC could save up to EUR 178,000 that could be allocated to other services.

Actions taken by UNDP
  1. Designs and Cost-Benefit Analysis
    Completed in September 2022. The design services included the preparation of a CBA to guide the selection of Energy and EE measures to be implemented.

  2. Procurement
    Completed in April 2023 for the PV panels and in September 2023 for the automation system and the water tanks.
    Completed in September 2025 for the installation of a second water reservoir.

  3. Implementation of Services/Works
    The installation of the PV system was completed by March. In April 2024, the new water reservoir was installed and connected. The automation system started being operated in May and finalised in August 2024. 

    The installation of the second water reservoir should be completed by December 2025.