Agios Synesios Church in Lysi/Akdoğan
Preventive Works
| Project Overview | |
|---|---|
| Start date of works | 17 April 2023 |
| End date of works | 20 June 2023 |
| Type of intervention | Preventive Works |
| Total project cost | €18,605 |
Before Photos
After Photos
Main interventions for this site included:
- Vegetation and debris cleaning
- External plaster repair works
- Internal plaster repair works
- Stone cornice works
- Masonry cleaning works
- Existing external concrete floor repair works
- Structural repairing work of the lintel section of the southern door
- Repointing and replastering of the masonry
- Grout treatment of the roof vault and checking the roof’s drainage system
- Closing of the openings with metal ventilation grill doors and windows.
- New gypsum floor works
- Painting of the exterior facades of the walls
The project is co-funded by the European Union and implemented by United Nations Development Programme in partnership with the Technical Committee on Cultural Heritage.